Feedbacks More>>

TS2 DIAG H3++ CFG H1+

Q1
No 10
No 30
Ospf: no passive interface
Dhcp: change to infinite because lease is short

Q2
SW 111: ospf cost is 100
It deleted

Q3

This problem did not go well.
TE will succeed by changing origin.
However, the displayed AS-path was not displayed
My result was that the AS number of the third hop was 19999.
But the question was AS number 65002.

Q4
the content of BGP was that it did not touch.
I changed the route by setting the OSPF cost of R20 Lo 0  is 0 to   100.

Q5
R60 subnet is different. / 32 / 24

Q6
VLAN 111 was not advertised to OSPFv 3 by SW 111.

Q7
The process ID of OSPF was different for R1 Lo 0.
In R 10 ospf  external was 19.
It changed to 201.

 There were things
I was wasted in in ignoring.
There was a router with mpls ldp router-id lo 0 and mpls label  protocol ldp set in R1 - R6, and a router not configured.

The route-target imports its own export
I was worried about  changing.
However, it was described as separete 2 faults in the problem
sentence, and traceroute was the result that was requested and I
ignored it.

Q8
SW 300/301: vlan 2000 & 2001 ip dhcp relay information trust
SW 310: ip arp inspection
Dhcp: change to infinite because lease is short

Q9
Ospf network type is change

Q 10
Nat pool was set up.
I set up the ip nat outside source static 201.99.70.2 . . .  
Command on R24 and R25 and it was able to telnet.

DIAG H3++ same   as spoto solutions

CFG H1+ same

Read More >>

TS1 DIAG H2++ CFG H1+

TS1
1 - ACL on SW1

2- ppp and chap config on R17

3- R22 interface was not in OSPF,
some problem on R5

4- very simple, just R12 with a shut interface

5- always takes me forever.
I changed many things.
R22 had bad RID for Ospf,
R3 had no ospf Nei towards R21

6- Simple fix to next hop

7- R18 had ACL on serial interface and was missing some nhrp commands. All routers needed shortcut, R15 needed redirect

8- Fixed LDP between R1/2,
bad nat on R8, added cost for interface E2/0 on R4/6,
fixed dhcp problem on R104

9- R21 had ACL that needed fixing,
R24 had bad encryption for tunnel,
R23 had bad NAT

10- fixed dhcp config on NAS
Diag  H2++ - same as spoto

CFG H1+ - looked like spoto .
I couldn't solve ssh  R20, did everything as per solution but ssh  was denied

Couldn't remember encryption commands for DMVPN tunnel on VRF Trace  
routes worked beautifully Really ran out of time but happy I made it

Read More >>

    ccie collaboration lab training ukraine - SPOTO CCIE CLUB

  • 684 Reviews
  • You must pass the two-hour written exam covering areas such as protocols, operating systems, application protocols, technologies, and Cisco ccie collaboration lab training ukraine applications before you are eligible to schedule the lab exam. The program is the highest level certification of Cisco System in Network .It distinguishes the experts who can Plan, Strategize, Implement and Diagnose the Solutions of the Network against any vulnerability.

    CCIE Collaboration LAB Preparation Process 2018 Download PDF


    SPOTO CCIE CLUB offers all Cisco track written and lab dumps.Besides, We had already helped more than 500 CCIE candidates obtain the magical CCIE number since October 2015. Feel free to contact We team if you have any CCIE related problem that we can help you with.

1. Before SPOTO CCIE Collab LAB (Option for 0 Basic)

CCNA RS
.CCNA Collab (Watch INE Video or others, 1 weeks)
.Option CCNP Collab (Watch INE Video or others, 2 weeks-8weeks)
.Option Finish IPX/360/INE Collab Workbook (4weeks -12weeks)

CCIE Collab Study:
•MONDAY
◦Network Infrastructure
◦Cisco Unified Communications Manager Setup (CUCM)
◦Device Registration
◦Cisco IOS Gateways
•TUESDAY
◦Cisco Unified Border Element (CUBE)
◦Regions and Locations
◦Media Resources
•WEDNESDAY
◦Static Dial Plan Routing
◦Dynamic Dial Plan Routing
◦Unified Mobility
◦Dial Rules
◦Users and LDAP
•THURSDAY
◦Misc CUCM Features
◦CUCM TRACES and Troubleshooting
•FRIDAY
◦CUCM Express (CUCME)
•SATURDAY
◦Unified Messaging – Unity Connection
◦Unified Messaging – Unity Express
◦Unified Contact Center Express
•SUNDAY
◦Unified Presence
◦Jabber
◦Quality of Service (QoS)
◦Lab Strategy

    CCIE Collaboration Written Dumps Demo





    CCIE Collaboration LAB Dumps Sevice


    We provides and updates the latest dumps for you during the service period. We offer the CCIE Collab dumps for 7 days. We updates freely 2 months for CCIE Collab Lab.

    CCIE Collaboration 400-051 Written

  • Exam Number: 400-051
  • Associated Certifications: CCIE Collaboration
  • Duration: 120 minutes (90-110 questions)
  • Available Languages: English

    CCIE Collaboration 400-051 Lab

    The lab exam is an eight-hour, hands-on exam which requires you to configure and troubleshoot a series of complex networks to given specifications. Knowledge of troubleshooting is an important skill and candidates are expected to diagnose and solve issues as part of the CCIE Collaboration lab exam.

Get Dumps