rs ccnp test requirements - SPOTO CCIE CLUB

CCIE Routing & Switching Written and Lab Dumps

Feedbacks More>>

TS2 DIAG H3++ CFG H1+

Q1
No 10
No 30
Ospf: no passive interface
Dhcp: change to infinite because lease is short

Q2
SW 111: ospf cost is 100
It deleted

Q3

This problem did not go well.
TE will succeed by changing origin.
However, the displayed AS-path was not displayed
My result was that the AS number of the third hop was 19999.
But the question was AS number 65002.

Q4
the content of BGP was that it did not touch.
I changed the route by setting the OSPF cost of R20 Lo 0  is 0 to   100.

Q5
R60 subnet is different. / 32 / 24

Q6
VLAN 111 was not advertised to OSPFv 3 by SW 111.

Q7
The process ID of OSPF was different for R1 Lo 0.
In R 10 ospf  external was 19.
It changed to 201.

 There were things
I was wasted in in ignoring.
There was a router with mpls ldp router-id lo 0 and mpls label  protocol ldp set in R1 - R6, and a router not configured.

The route-target imports its own export
I was worried about  changing.
However, it was described as separete 2 faults in the problem
sentence, and traceroute was the result that was requested and I
ignored it.

Q8
SW 300/301: vlan 2000 & 2001 ip dhcp relay information trust
SW 310: ip arp inspection
Dhcp: change to infinite because lease is short

Q9
Ospf network type is change

Q 10
Nat pool was set up.
I set up the ip nat outside source static 201.99.70.2 . . .  
Command on R24 and R25 and it was able to telnet.

DIAG H3++ same   as spoto solutions

CFG H1+ same

Read More >>

TS1 DIAG H2++ CFG H1+

TS1
1 - ACL on SW1

2- ppp and chap config on R17

3- R22 interface was not in OSPF,
some problem on R5

4- very simple, just R12 with a shut interface

5- always takes me forever.
I changed many things.
R22 had bad RID for Ospf,
R3 had no ospf Nei towards R21

6- Simple fix to next hop

7- R18 had ACL on serial interface and was missing some nhrp commands. All routers needed shortcut, R15 needed redirect

8- Fixed LDP between R1/2,
bad nat on R8, added cost for interface E2/0 on R4/6,
fixed dhcp problem on R104

9- R21 had ACL that needed fixing,
R24 had bad encryption for tunnel,
R23 had bad NAT

10- fixed dhcp config on NAS
Diag  H2++ - same as spoto

CFG H1+ - looked like spoto .
I couldn't solve ssh  R20, did everything as per solution but ssh  was denied

Couldn't remember encryption commands for DMVPN tunnel on VRF Trace  
routes worked beautifully Really ran out of time but happy I made it

Read More >>

  • rs ccnp test requirements - SPOTO CCIE CLUB

  • 1988 Reviews
  • The problem was that when I went to the front door I read to my horror a sign saying that they had moved. rs ccnp test requirements I felt a surge of adrenaline rush through the pit of my stomach. Luckily, they had only moved to the other side of the same building rs ccnp test requirements Even though, that experience was very unnerving and I was still a bit jittery when I walked into the centre.