ine ccie lab cram - SPOTO CCIE CLUB

    CCIE Data Center 400-151 Lab

    The two parts to the eight-hour lab exam are to be taken in sequence during the day of the exam starting with Part 1, followed by Part 2 are:
  • Part 1: Diagnostic: 3 sets
  • Part 2: Configuration & Troubleshooting: 2 sets(old and variation)


  • Enquire Now

Feedbacks More>>

TS2 DIAG H3++ CFG H1+

Q1
No 10
No 30
Ospf: no passive interface
Dhcp: change to infinite because lease is short

Q2
SW 111: ospf cost is 100
It deleted

Q3

This problem did not go well.
TE will succeed by changing origin.
However, the displayed AS-path was not displayed
My result was that the AS number of the third hop was 19999.
But the question was AS number 65002.

Q4
the content of BGP was that it did not touch.
I changed the route by setting the OSPF cost of R20 Lo 0  is 0 to   100.

Q5
R60 subnet is different. / 32 / 24

Q6
VLAN 111 was not advertised to OSPFv 3 by SW 111.

Q7
The process ID of OSPF was different for R1 Lo 0.
In R 10 ospf  external was 19.
It changed to 201.

 There were things
I was wasted in in ignoring.
There was a router with mpls ldp router-id lo 0 and mpls label  protocol ldp set in R1 - R6, and a router not configured.

The route-target imports its own export
I was worried about  changing.
However, it was described as separete 2 faults in the problem
sentence, and traceroute was the result that was requested and I
ignored it.

Q8
SW 300/301: vlan 2000 & 2001 ip dhcp relay information trust
SW 310: ip arp inspection
Dhcp: change to infinite because lease is short

Q9
Ospf network type is change

Q 10
Nat pool was set up.
I set up the ip nat outside source static 201.99.70.2 . . .  
Command on R24 and R25 and it was able to telnet.

DIAG H3++ same   as spoto solutions

CFG H1+ same

Read More >>

TS1 DIAG H2++ CFG H1+

TS1
1 - ACL on SW1

2- ppp and chap config on R17

3- R22 interface was not in OSPF,
some problem on R5

4- very simple, just R12 with a shut interface

5- always takes me forever.
I changed many things.
R22 had bad RID for Ospf,
R3 had no ospf Nei towards R21

6- Simple fix to next hop

7- R18 had ACL on serial interface and was missing some nhrp commands. All routers needed shortcut, R15 needed redirect

8- Fixed LDP between R1/2,
bad nat on R8, added cost for interface E2/0 on R4/6,
fixed dhcp problem on R104

9- R21 had ACL that needed fixing,
R24 had bad encryption for tunnel,
R23 had bad NAT

10- fixed dhcp config on NAS
Diag  H2++ - same as spoto

CFG H1+ - looked like spoto .
I couldn't solve ssh  R20, did everything as per solution but ssh  was denied

Couldn't remember encryption commands for DMVPN tunnel on VRF Trace  
routes worked beautifully Really ran out of time but happy I made it

Read More >>

    How to pass CCIE Data Center LAB Exam first attempt Download PDF


    SPOTO CCIE CLUB offers all Cisco track written and lab dumps.Besides, We had already helped more than 500 CCIE candidates obtain the magical CCIE number since October 2015. Feel free to contact We team if you have any CCIE related problem that we can help you with.

    If first lab-attempt fail, then SECOND LAB ATTEMPT IS FREE (must appear within or in 40 days). Enumerated below are our service offering details:
    1. Data Center Written Review Guides (not INCLUDED Written Exam# 400-151)
    2. Data Center Lab Workbook(s)- refer attached the "Data Center Flow" guide.
    3. Data Center Lab Remote Rack Access. Total hours 140 hrs. Breakdown- Virtual Remote Rack access total of 100 hours, Physical Remote Rack 40 hours.
    4. Data Center Lab Prep. Instructor lead (Recorded lab guide session videos)
    5. Grade your work in a timely manner and provide a comprehensive review of your performance
    6. Answer your questions and provide guidance via SKYPE lab takers group or PM or group chat messaging
    7. Provide you with practical tips and techniques that have been put to the test
    8. Notify you of any updates or changes to the upcoming lab exam and make certain that you have the materials necessary to fully prepare for those changes

    CCIE Data Center LAB Examination Content CCIE Data Center Lab Dumps

  • ine ccie lab cram - SPOTO CCIE CLUB

  • 872 Reviews
  • SPOTO,Here they provide IT exams study material, the study materials included exams Q&A with Explanation, Study Guides, Training Labs, Exams Simulations, Training Videos, etc. ine ccie lab cram